PROJECT OVERVIEW

About This Project

In this project, the scope of work is extensive and involved various aspects of civil engineering and construction. The primary focus was on the removal of two existing structures and the construction of a new triple barrel box culvert at a critical intersection. This culvert improved the flow of Midlothian Creek and enhanced the overall infrastructure of the area.

In addition to the culvert construction, the project included the development of design plans, specifications, quantities, and cost estimates. This required a thorough understanding of engineering principles, construction techniques, and regulatory requirements. The preparation of permits, such as the 404 permit and IDNR floodway permit, was essential to ensure compliance with environmental regulations and to obtain necessary approvals for the project.

The project also involved various roadway improvements, such as the addition of new right-turn lanes, reconstruction of medians, replacement of curb and gutter, and adjustments of drainage infrastructure. These enhancements improved traffic flow, safety, and accessibility for motorists and pedestrians in the area.

Furthermore, the project included the modernization of traffic signals, replacement of sidewalks, construction of a shared use path, pavement markings, and tree removal and replacement. These elements contribute to the overall aesthetics and functionality of the roadway, creating a more cohesive and sustainable transportation network.

To minimize disruptions to the surrounding community, the reconstruction was completed using a detour route for US 6 and staged construction for IL 50. This phased approach allowed for access to driveways and entrances on both roads to be maintained at all times, ensuring minimal impact on local businesses and residents.

Overall, this project showcases the importance of responsible planning, design, and construction practices in improving infrastructure and promoting sustainable development. By addressing various aspects of civil engineering and transportation, this project enhanced the overall quality of life for those who utilize the intersection of US 6 and IL 50.

PROJECT IMPACT

Key Outcomes

Improved Midlothian Creek flow through construction of a new triple barrel box culvert

Secured full environmental compliance via 404 and IDNR floodway permits

Enhanced traffic flow and safety with new right-turn lanes and reconstructed medians

Modernized traffic signals for improved intersection operations

Improved pedestrian access with new sidewalks and a shared use path

Upgraded roadway aesthetics through pavement markings and drainage adjustments

Minimized community disruption through detour and staged construction approach

Maintained continuous driveway and entrance access throughout construction

Project Information

Client

Illinois Department of Transportation

Location

Oak Forest, IL

Project Type

Roadway & Bridge Reconstruction

Completion

Completed 2019