PROJECT OVERVIEW
About This Project
In this project, the focus was on the realignment of 179th St. to create a four-leg signalized intersection, requiring detailed design plans, specifications, quantities, and a construction cost estimate. The reconstruction involved the removal of an existing cast-in-place concrete box culvert under US 6 and its replacement in-kind. The staged construction approach was utilized to ensure the project’s completion with minimal disruption to traffic flow and local businesses.
The enhancements to the intersection included the addition of two new left-turn lanes, right-turn lanes, drainage improvements, lighting, bicycle and pedestrian paths, and utility relocation. These improvements enhanced safety, accessibility, and overall traffic flow in the area, catering to the needs of motorists, cyclists, and pedestrians alike.
Furthermore, the project’s federal funding status required extensive coordination between municipalities and other local agencies. This collaboration was essential for ensuring compliance with federal regulations and guidelines, as well as for leveraging resources and expertise from various stakeholders to successfully complete the project.
The realignment of 179th St. and the creation of a four-leg signalized intersection represent a significant infrastructure improvement that will benefit the community by providing safer and more efficient transportation options. The project’s comprehensive approach, including roadway realignment, intersection enhancements, and multi-modal transportation improvements, underscores the commitment to sustainable and inclusive urban planning and development.
Overall, this project exemplifies the importance of effective project management, stakeholder engagement, and multidisciplinary collaboration in delivering successful infrastructure projects that meet the needs of the community while adhering to regulatory requirements and ensuring long-term sustainability.
PROJECT IMPACT
Key Outcomes
Created a safer, more efficient four-leg signalized intersection through 179th St. realignment
Replaced aging box culvert in-kind, restoring structural integrity under US 6
Reduced congestion with new left-turn and right-turn lanes
Improved multimodal access through new bicycle and pedestrian paths
Enhanced night-time visibility and safety with new lighting systems
Minimized disruption to traffic and local businesses via staged construction
Ensured federal compliance through extensive multi-agency coordination
Delivered a comprehensive, sustainable urban infrastructure improvement
Project Information
Client
Illinois Department of Transportation
Location
Oak Forest, IL
Project Type
Intersection Realignment & Signalization
Completion
Completed 2019