East Avenue at Joliet Road and 55th Street
PROJECT OVERVIEW
About This Project
In this project, the responsibility involved comprehensive design plans, specifications, quantities, and construction cost estimates for channelization improvements along East Ave. from Joliet Rd. to 55th St. and along 55th St. from Dansher to Joliet Rd., in the Villages of McCook and Hodgkins and the City of Countryside in Cook County. The scope of work encompassed multiple intersections, including East Ave. at Joliet Rd., East Ave. at 55th St., and 55th St. at Sergo Dr., with a focus on traffic signal modernization, pedestrian safety enhancements, and infrastructure upgrades.
The project included the installation of traffic signal modernization features such as pedestrian signal heads, countdown timers, and pedestrian push buttons, enhancing safety and accessibility for all road users. The existing EVP system at all three intersections was maintained to ensure continuity and efficiency in traffic management. Additionally, ADA ramps were installed at the intersections to comply with accessibility standards, and a mid-block RRFB (Rectangular Rapid Flashing Beacon) was installed to assist pedestrians crossing East Ave., further prioritizing pedestrian safety.
To meet environmental requirements, the project necessitated all necessary environmental clearances, and land acquisition was also required for the implementation of the channelization improvements. Coordination with Pace Bus was another crucial aspect to ensure smooth integration with public transportation services. To minimize disruptions, traffic was maintained through staged construction, allowing for the completion of work while ensuring continued traffic flow in the area.
The project also involved the construction of a retaining wall along East Ave. to provide structural support and enhance safety at these locations. Additionally, minor structural repairs were conducted on four culverts within the project limits to maintain the integrity of the infrastructure.
Overall, this project showcases a holistic approach to intersection improvements, emphasizing safety, accessibility, and infrastructure enhancements. By incorporating modern traffic signal technologies, pedestrian-friendly features, and necessary structural upgrades, the project aims to improve traffic flow, enhance pedestrian safety, and support sustainable transportation infrastructure in the region. The coordination with various stakeholders, adherence to environmental regulations, and strategic construction planning underscore the commitment to delivering a high-quality and comprehensive transportation improvement project.
PROJECT IMPACT
Key Outcomes
Modernized traffic signals with pedestrian heads, countdown timers, and push buttons
Enhanced pedestrian safety through new ADA ramps and a mid-block RRFB
Maintained EVP system continuity across all three intersections
Improved structural support with a new retaining wall along East Ave.
Extended infrastructure integrity through repairs to four culverts
Secured full environmental clearances and necessary land acquisition
Coordinated with Pace Bus for seamless public transit integration
Maintained continuous traffic flow through staged construction
Project Information
Client
Illinois Department of Transportation
Location
Countryside, McCook and Hodgkins, IL
Project Type
Intersection & Channelization Improvement
Completion
Completed 2023