PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) spearheaded an extensive project by providing an array of survey and Subsurface Utility Engineering (SUE) services, encompassing SUE Quality Levels B and A, to meticulously identify the utilities within the defined project boundaries. The project’s overarching objective was to conduct thorough surveying and ASCE 38-22 compliant SUE services along IL 31, spanning from IL 176 to IL 120, in order to gain a comprehensive understanding of the underground utility network.

AGI’s team meticulously assessed and estimated a total of 245,000 linear feet of utilities within the project area. This included 41,000 feet of water lines, 52,000 feet of telephone lines, 31,000 feet of electric lines, 54,000 feet of gas lines, 12,000 feet of CATV, 45,000 feet of fiber optic lines, and 10,000 feet of unidentified utilities. By accurately designating and documenting these utilities, AGI provided vital information crucial for the successful planning and execution of the project along IL 31 from IL 176 to IL 120.

In addition to the comprehensive utility mapping, AGI conducted test holes at 6 locations along a gas line, enhancing the accuracy and reliability of the project data. The deliverables for this project were presented in a sophisticated 3D format, showcasing detailed and immersive visualization of the utilities for reference during the construction phase.

AGI’s proficiency in delivering survey and SUE services at Quality Levels B and A played a pivotal role in the seamless progress of the project along IL 31, ensuring efficient construction activities and safeguarding the integrity of the underground utility infrastructure. The meticulous approach, inclusion of test holes, and utilization of 3D deliverables exemplify AGI’s commitment to excellence in utility mapping and engineering services.

PROJECT IMPACT

Key Outcomes

Mapped 245,000 linear feet of utilities across the IL 31 project corridor

Delivered immersive 3D visualization for detailed construction-phase reference

Conducted 6 gas line test holes to enhance data accuracy and reliability

Identified over 54,000 feet of critical gas lines within project limits

Combined SUE Quality Levels A and B for a comprehensive utility assessment

Safeguarded the integrity of underground infrastructure along IL 31

Supported efficient construction activities from IL 176 to IL 120

Delivered top-tier utility mapping exemplifying AGI's engineering excellence

Project Information

Client

Illinois Department of Transportation

Location

Will County, IL

Project Type

SUE Quality Level A & B and Surveying

Completion

SUE Completed 2023