Beech Lane Water Main Replacement

Beech Lane Watermain

PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) has been tasked with the important project of replacing the watermain along Beech Ln. This project involves abandoning the existing 4″ watermain and replacing it with a more efficient 8″ watermain for the benefit of the residents in the area. By upgrading to a larger watermain, residents can enjoy improved water flow and pressure.

To minimize disruption to the surrounding properties, AGI plans to directionally bore the new watermain between Beech Ln. and Wade St. This method of installation will help to reduce impacts on the side yards of properties, particularly at 1191 Beech Ln. Additionally, a Plat of Survey for a Permanent Easement has been prepared for the watermain at this location to ensure proper legal documentation.

Overall, this project demonstrates AGI’s commitment to providing high-quality and efficient watermain replacement services while also prioritizing the needs and convenience of the residents along Beech Ln. With their expertise and attention to detail, AGI was dedicated to completing this project in a timely and professional manner.

PROJECT IMPACT

Key Outcomes

Upgraded from a 4" to an 8" watermain, improving water flow and pressure

Minimized property disruption through a directional boring technique

Secured proper legal documentation via a Plat of Survey for Permanent Easement

Reduced impact to side yards at sensitive properties like 1191 Beech Ln.

Enhanced water infrastructure reliability for area residents

Delivered efficient, professional project execution within a defined timeline

Prioritized resident convenience and minimal disruption throughout construction

Strengthened Highland Park's overall water distribution network

Project Information

Client

City of Highland Park

Location

Highland Park, IL

Project Type

Water Main Replacement

Completion

Completed 2023