MFT 2023 Resurfacing
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) undertook a crucial role in the enhancement of the infrastructure within the city by preparing detailed plans, specifications, and construction cost estimates for the revitalization of several streets. The scope of this project included the resurfacing, installation of curb and gutters, and the design of ADA ramps for the following streets: Krenn Ave. stretching from Hill St. to E. Old Elm Rd. covering a distance of 0.5 miles, and Western Ave. extending from Western Pl. to Old Elm Rd. encompassing a span of 0.2 miles.
In order to ensure precise and accurate planning, AGI conducted a comprehensive topographic survey that encompassed various aspects including surveying, alignment and ties, tree survey, ADA Ramp survey, and cross sections. This detailed survey served as the foundation for the development of the contract plans, specifications, and construction cost estimate, ensuring that the project was meticulously planned and executed.
The design and implementation of ADA ramps are of particular importance as they provide accessibility for individuals with disabilities, ensuring that the streets are inclusive and compliant with ADA regulations. By incorporating these ramps into the design, AGI is not only improving the infrastructure of the streets but also making them more accessible to all members of the community.
Through their expertise and attention to detail, AGI has played a vital role in the revitalization and improvement of the city’s streets. By providing comprehensive services ranging from surveying to design and cost estimation, AGI has demonstrated their commitment to delivering high-quality and sustainable infrastructure solutions that benefit the community as a whole.
PROJECT IMPACT
Key Outcomes
Resurfaced Krenn Ave. and Western Ave., improving overall roadway conditions
Designed new curb and gutters enhancing drainage and durability
Delivered ADA-compliant ramps improving accessibility for all residents
Conducted a comprehensive topographic survey supporting precise project planning
Prepared detailed contract plans, specifications, and cost estimates
Enhanced inclusivity and ADA regulation compliance across project streets
Covered 0.7 combined miles of Highland Park roadway revitalization
Delivered sustainable, high-quality infrastructure benefiting the community
Project Information
Client
City of Highland Park
Location
Highland Park, IL
Project Type
MFT Roadway Resurfacing
Completion
Completed 2023