US 14 at Union Pacific and Canadian National Railroad – Viaduct Drainage Improvements

US 14 Viaduct Drainage Improvements hires
US 14 Viaduct Drainage

PROJECT OVERVIEW

About This Project

This project involved the comprehensive design, planning, and estimation for the replacement of the existing drainage system, which was integral to the larger reconstruction of Pump Station No. 8. The primary objective was to develop plans, specifications, and cost estimates that ensured the efficient conveyance of stormwater and reduced flood risk in the area, particularly at the viaduct prone to frequent flooding.

The scope included designing new sewer systems, which featured oversized sewers to provide linear detention. These sewers were specifically designed to compensate for the 15’x15’ underground detention vault originally planned to be built adjacent to the pump station. The oversized sewers provided the required detention storage, acting as a critical flood mitigation measure in place of the vault, ensuring that stormwater could be efficiently managed to reduce flood frequency.

In addition to the new sewer system, portions of the pipeline were installed using jacking techniques to pass underneath the historic 100-year-old railroad bridge, a delicate operation that required careful coordination to prevent damage to this structure.

As part of the project, a feasibility study was conducted to evaluate the potential construction of a retaining wall along the north side of US 14. This retaining wall will accommodate a future bike path to be developed by the City of Des Plaines.

The study ensured that the future development was taken into consideration in the current drainage and road reconstruction plans.

Services Provided:

  • Surveying: Extensive topographic and utility surveys to assess existing conditions and ensure accurate design.
  • Drainage Design: Comprehensive stormwater management solutions, including oversized sewers for flood detention.
  • Maintenance of Traffic: Temporary traffic control plans to ensure safe and efficient vehicle flow during construction.
  • Road Resurfacing and Reconstruction Plans: Detailed plans for the resurfacing and reconstruction of US 14.
  • Detour Route Planning: Due to the limited width under the viaduct, a Detour Route was developed to mitigate traffic disruptions during the construction phase.

PROJECT IMPACT

Key Outcomes

Designed a new drainage system integral to the Pump Station No. 8 reconstruction

Reduced flood risk at a viaduct historically prone to frequent flooding

Delivered oversized sewers providing linear detention in place of a vault

Safely installed pipeline beneath a historic 100-year-old railroad bridge via jacking

Evaluated retaining wall feasibility to support a future city bike path

Developed detour route planning to mitigate traffic disruption at the viaduct

Prepared detailed road resurfacing and reconstruction plans for US 14

Delivered comprehensive maintenance of traffic plans ensuring safe construction

Project Information

Client

Illinois Department of Transportation

Location

Des Plaines, IL

Project Type

Drainage & Viaduct Improvement Design

Completion

Design Completed 2022