Various ADA Ramps
PROJECT OVERVIEW
About This Project
This project entailed the preparation of detailed contract plans, specifications, and a comprehensive construction cost estimate for the design and survey of ADA-compliant curb ramps along Dempster Street, from Waukegan Road to Skokie Boulevard. The primary objective was to enhance pedestrian accessibility by ensuring all curb ramps within the project limits met current ADA (Americans with Disabilities Act) standards. This work was part of a broader resurfacing project overseen by IDOT, with the ADA ramp designs being integrated into the overall roadway improvement plans.
The project focused on surveying existing curb ramps, identifying non-compliant locations, and redesigning them to meet the latest Public Right-of-Way Accessibility Guidelines (PROWAG) guidelines. This included addressing issues related to ramp slope, width, detectable warning surfaces, and proper alignment with pedestrian crossings. The newly designed ADA curb ramps were tailored to fit into the IDOT resurfacing plans for Dempster Street, ensuring seamless integration with the overall pavement improvements.
Key Elements:
- ADA Ramp Design: The primary focus was on redesigning curb ramps to ensure accessibility for all users. This included:
- Ensuring proper cross slopes, running slopes, and landings.
- Installing detectable warning surfaces (truncated domes) to provide tactile cues for visually impaired pedestrians.
- Aligning ramps with pedestrian signal locations where applicable.
- Ensuring sufficient width and maneuverability for users with mobility devices such as wheelchairs.
- Survey and Field Assessment: Detailed field surveys were conducted to assess the current conditions of the existing curb ramps and sidewalks. The surveys gathered critical data on slopes, elevations, and obstructions to ensure the new designs would comply with ADA regulations and improve pedestrian safety and comfort.
- Integration with IDOT Resurfacing Plans: The ADA ramp improvements were designed in coordination with IDOT’s broader resurfacing project for Dempster Street. This coordination ensured that the new ramps fit seamlessly within the planned pavement resurfacing, preventing conflicts during construction and optimizing the use of resources. The ADA plans were inserted into the overall resurfacing plans, simplifying the construction process.
- Construction Phasing and Traffic Management: Construction activities were planned using intermittent or moving operations to minimize traffic disruptions along this busy corridor. This method allowed for efficient construction while maintaining traffic flow, reducing the impact on local businesses and commuters.
- Environmental and Regulatory Compliance: The ADA ramp design adhered to all relevant federal and state accessibility standards, ensuring compliance with the ADA and other applicable guidelines.
Services Provided:
- Contract Plan Preparation: Creation of detailed construction plans for ADA ramp improvements, including ramp dimensions, slopes, and required materials.
- Specifications Development: Drafting of technical specifications for ADA ramp construction to ensure contractors adhered to required standards.
- Survey and Assessment: Field surveys to document existing conditions and identify locations requiring ADA-compliant improvements.
- Cost Estimation: Preparation of a detailed construction cost estimate to provide accurate budgeting for the ADA improvements.
- Traffic and Construction Management: Planning for intermittent construction operations to ensure minimal disruption to traffic and local businesses during the project.
PROJECT IMPACT
Key Outcomes
Redesigned non-compliant curb ramps to meet current PROWAG standards
Installed detectable warning surfaces improving safety for visually impaired pedestrians
Conducted detailed field surveys documenting slopes, elevations, and obstructions
Seamlessly integrated ADA ramp designs within IDOT's resurfacing plans
Minimized traffic disruption through intermittent, moving construction operations
Ensured proper ramp alignment with pedestrian signal locations
Delivered accurate cost estimates supporting efficient project budgeting
Enhanced accessibility and compliance along the Dempster Street corridor
Project Information
Client
Illinois Department of Transportation
Location
Cook County, IL
Project Type
ADA Curb Ramp Design & Survey
Completion
Design Completed 2023