IL 72 over Tyler Creek
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) took on a significant role in the project, overseeing the design, specifications, quantities, and construction cost estimate for the replacement of a double box culvert and filling another culvert located approximately 600 feet apart with a single triple cell box culvert. This involved intricate planning and coordination to ensure the smooth execution of the project.
In addition to the culvert replacement, AGI managed various other tasks including resurfacing, earthwork to widen the shoulders, and coordination of utilities. This comprehensive approach allowed for the project to address multiple infrastructure needs in a cohesive and efficient manner.
Navigating the regulatory landscape, AGI secured necessary permits such as the Army Corps of Engineering Section 404 Permit and IDNR Floodway Permits, demonstrating a commitment to compliance and environmental stewardship. These permits were essential in ensuring that the project met all legal requirements and environmental standards.
To minimize disruptions to traffic flow, AGI implemented staged construction and utilized a temporary traffic signal to maintain traffic flow throughout the duration of the project. This strategic approach helped to mitigate congestion and ensure the safety of motorists and construction workers.
Notably, the project was federally funded, highlighting AGI’s ability to successfully manage projects with diverse funding sources and strict compliance requirements. Through meticulous planning, attention to detail, and effective coordination, AGI successfully delivered a critical infrastructure improvement project that will benefit the community for years to come.
PROJECT IMPACT
Key Outcomes
Replaced a double box culvert with a single triple cell box culvert
Coordinated culvert consolidation across two locations 600 feet apart
Widened shoulders through targeted earthwork and resurfacing
Secured Army Corps of Engineers Section 404 and IDNR Floodway Permits
Maintained traffic flow via staged construction and a temporary signal
Successfully managed a federally funded project with strict compliance requirements
Coordinated utilities to support a cohesive infrastructure improvement
Delivered a critical infrastructure improvement benefiting the community long-term
Project Information
Client
Illinois Department of Transportation
Location
Pingree Grove, IL
Project Type
Culvert Replacement & Roadway Improvements
Completion
Design Completed 2016