PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) took on a complex and multifaceted project involving the replacement of a double cell box culvert with a double cell cast-in-place box culvert at a challenging 54-degree skew. The team meticulously crafted detailed design plans, specifications, cost estimates, and quantities, ensuring that every aspect of the project was carefully considered and planned.

In addition to the culvert replacement, AGI oversaw a range of additional tasks including resurfacing, earthwork to widen the shoulders, and coordination of utilities. These complementary efforts were crucial in ensuring the overall success and effectiveness of the infrastructure improvement project.

Navigating the regulatory landscape, AGI secured a series of essential permits including the Army Corps of Engineers Section 404 Permit, IDNR/OWR Floodway Permits, and Stormwater Pollution Prevention Plan (SWPPP) Permit. By obtaining these permits, AGI demonstrated a commitment to environmental compliance and the protection of natural resources throughout the project’s lifecycle.

To minimize disruptions and maintain the flow of traffic, AGI implemented staged construction methods and installed a temporary traffic signal. This strategic approach not only ensured the safety of motorists and construction workers but also optimized the efficiency of the construction process.

It is noteworthy that this project was federally funded, underscoring AGI’s capability to successfully manage and execute projects with diverse funding sources and stringent compliance requirements. Through meticulous planning, expert coordination, and unwavering dedication to quality, AGI delivered a critical infrastructure enhancement that will have a lasting positive impact on the community.

PROJECT IMPACT

Key Outcomes

Replaced a double cell box culvert at a challenging 54-degree skew

Delivered a double cell cast-in-place box culvert design solution

Widened shoulders and resurfaced roadway through coordinated earthwork

Secured Section 404, IDNR/OWR Floodway, and SWPPP Permits

Maintained traffic flow via staged construction and a temporary signal

Successfully managed a federally funded project with strict compliance

Coordinated utilities supporting a comprehensive infrastructure solution

Delivered a critical infrastructure enhancement with lasting community impact

Project Information

Client

Illinois Department of Transportation

Location

Pingree Grove, IL

Project Type

Culvert Replacement at 54-Degree Skew

Completion

Design Completed 2016