IL 47 over Eakin Creek
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) took on a complex and multifaceted project involving the replacement of a double cell box culvert with a double cell cast-in-place box culvert at a challenging 54-degree skew. The team meticulously crafted detailed design plans, specifications, cost estimates, and quantities, ensuring that every aspect of the project was carefully considered and planned.
In addition to the culvert replacement, AGI oversaw a range of additional tasks including resurfacing, earthwork to widen the shoulders, and coordination of utilities. These complementary efforts were crucial in ensuring the overall success and effectiveness of the infrastructure improvement project.
Navigating the regulatory landscape, AGI secured a series of essential permits including the Army Corps of Engineers Section 404 Permit, IDNR/OWR Floodway Permits, and Stormwater Pollution Prevention Plan (SWPPP) Permit. By obtaining these permits, AGI demonstrated a commitment to environmental compliance and the protection of natural resources throughout the project’s lifecycle.
To minimize disruptions and maintain the flow of traffic, AGI implemented staged construction methods and installed a temporary traffic signal. This strategic approach not only ensured the safety of motorists and construction workers but also optimized the efficiency of the construction process.
It is noteworthy that this project was federally funded, underscoring AGI’s capability to successfully manage and execute projects with diverse funding sources and stringent compliance requirements. Through meticulous planning, expert coordination, and unwavering dedication to quality, AGI delivered a critical infrastructure enhancement that will have a lasting positive impact on the community.
PROJECT IMPACT
Key Outcomes
Replaced a double cell box culvert at a challenging 54-degree skew
Delivered a double cell cast-in-place box culvert design solution
Widened shoulders and resurfaced roadway through coordinated earthwork
Secured Section 404, IDNR/OWR Floodway, and SWPPP Permits
Maintained traffic flow via staged construction and a temporary signal
Successfully managed a federally funded project with strict compliance
Coordinated utilities supporting a comprehensive infrastructure solution
Delivered a critical infrastructure enhancement with lasting community impact
Project Information
Client
Illinois Department of Transportation
Location
Pingree Grove, IL
Project Type
Culvert Replacement at 54-Degree Skew
Completion
Design Completed 2016