PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) played a crucial role as a Subconsultant to HBM Engineering Group, LLC for a comprehensive contract focused on roadway and bridge repair and rehabilitation. This project involved the rehabilitation of existing mainline ramp pavements, bridges, roadway lighting updates, cross road structure rehabilitation, and various other related tasks to improve the overall infrastructure in the area.

AGI’s tasks in this contract were diverse and essential to the successful completion of the project. The scope of work included performing a supplemental survey to gather detailed information about the existing conditions, providing crucial maintenance of traffic support to ensure the safety of workers and motorists during construction activities, and conducting structural bridge and retaining wall inspections to assess the condition of key infrastructure elements.

One of the significant responsibilities undertaken by AGI was preparing Bridge Condition Reports for the eastbound and westbound sections of IL 390 over Rodenburg Rd. (Structures 1609 and 1610) and Structure Technical Memos for retaining walls on Plazas 328 and 330. Additionally, AGI was tasked with developing repair plans for the bridges and retaining walls, preparing civil cross-sections to aid in the design and construction process, and preparing Maintenance of Traffic Plans.

By conducting thorough inspections, preparing detailed reports, and developing comprehensive repair plans, AGI contributed significantly to enhancing the safety, functionality, and longevity of the roadway and bridge structures. Their commitment to delivering high-quality services in structural design and repair planning underscores their importance as a vital partner in the successful completion of this complex infrastructure project.

PROJECT IMPACT

Key Outcomes

Conducted structural bridge and retaining wall inspections across the corridor

Prepared Bridge Condition Reports for Structures 1609 and 1610 over Rodenburg Rd.

Developed Structure Technical Memos for retaining walls on Plazas 328 and 330

Delivered repair plans and civil cross-sections supporting design and construction

Provided maintenance of traffic support ensuring worker and motorist safety

Performed supplemental surveys gathering detailed existing condition data

Enhanced safety and longevity of mainline ramp pavements and bridges

Supported HBM Engineering Group in a comprehensive Tollway rehabilitation program

Project Information

Client

Illinois Tollway (AGI as subconsultant to HBM Engineering Group, LLC)

Location

Illinois Tollway

Project Type

Roadway & Bridge Preservation and Rehabilitation

Completion

Design Completed 2025