PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) played a pivotal role in the comprehensive bridge and roadway improvement project for the 170th Street Bridge over Thorn Creek (SN 016-3095), located in the Village of South Holland, Illinois. This project, situated east of Interstate 94 and west of Torrence Avenue, was focused on modernizing the aging infrastructure to enhance traffic flow and ensure long-term structural integrity.

The existing bridge, which spans Thorn Creek, supported four lanes of traffic and featured a two-span, prestressed concrete box beam structure with a total length of approximately 102 feet. To meet current engineering standards and accommodate increased traffic loads, the proposed design called for a significant upgrade. The new bridge was designed as a three-span structure with a length of 153 feet, utilizing a steel multi-beam superstructure for enhanced durability and load-bearing capacity.

In addition to the bridge upgrade, the project encompassed roadway improvements over a total stretch of approximately 400 feet, centered around the bridge. These improvements were aimed at ensuring smooth transitions and alignment with the new bridge structure, enhancing the overall safety and functionality of the roadway.

AGI’s contributions to the project were extensive, involving the completion of multiple key tasks, including:

  • Supplemental Survey: AGI conducted detailed supplemental surveys to update and refine the existing site data, ensuring that the design and construction plans were based on the most accurate and current information.
  • Roadway Plans: AGI developed comprehensive roadway plans to guide the construction process, ensuring the smooth integration of the new bridge with the surrounding road infrastructure.
  • Watermain Plans: AGI prepared detailed plans for the relocation and installation of water mains in the project area, addressing potential utility conflicts and ensuring the continued operation of water services throughout construction.
  • IEPA Permit Coordination: AGI handled the preparation and submission of the Illinois Environmental Protection Agency (IEPA) permits required for the project. This included compliance with environmental regulations and ensuring that all aspects of the project met state requirements for water and environmental protection.
  • Specifications and Quantities: AGI was responsible for developing the detailed project specifications and compiling the necessary quantities of materials and resources required for construction. This task was critical for the accurate estimation of costs and for ensuring that contractors had precise guidelines to follow during the project’s execution.

By delivering these services, AGI ensured that the 170th Street Bridge improvement project met the highest standards of safety, structural integrity, and regulatory compliance. The proposed bridge upgrade and related roadway enhancements were designed to support the community’s growing traffic demands while improving the long-term resilience of the infrastructure.

PROJECT IMPACT

Key Outcomes

Upgraded a 102-foot two-span bridge to a new 153-foot three-span structure

Delivered a steel multi-beam superstructure for enhanced durability

Completed roadway improvements across approximately 400 feet

Conducted supplemental surveys ensuring accurate design data

Prepared watermain relocation plans addressing utility conflicts

Coordinated IEPA permits ensuring environmental regulatory compliance

Delivered detailed specifications and quantities supporting accurate cost estimation

Enhanced long-term resilience and traffic capacity of the corridor

Project Information

Client

Cook County Department of Transportation and Highways (Sub to HDR Engineering)

Location

Cook County, IL

Project Type

Bridge Replacement & Roadway Improvement

Completion

Survey and Roadway Design Completed 2023