Traffic Signal Analysis for Detour Routes
PROJECT OVERVIEW
About This Project
In response to the City of Chicago Department of Transportation’s (CDOT) request, the Illinois Department of Transportation (IDOT) was tasked with conducting a Traffic Signal Analysis for two IDOT contracts that involve the implementation of Detour Routes. This analysis is crucial for assessing the impact of the detours on traffic flow and ensuring the safety and efficiency of the roadways during the construction phase.
Accurate Group, Inc. (AGI) played a key role in this process by compiling traffic count information obtained from Quality Counts. AGI used this information to prepare a detailed detour technical memo that outlined the potential impacts of the detours to the traveling public. These memos were submitted to the Chicago Department of Transportation (CDOT) for approval, ensuring that all necessary measures are taken to mitigate any disruptions caused by the detours.
The preparation of two Technical Memos, one for each contract, demonstrates the thoroughness and attention to detail that the project team is applying to ensure the successful implementation of the Detour Routes. By conducting a comprehensive Traffic Signal Analysis and presenting the findings in a clear and detailed manner, the project team worked to proactively address any potential challenges and ensure that the detours are implemented smoothly and effectively. This collaborative effort between IDOT, AGI, and CDOT highlights the commitment to delivering high-quality infrastructure projects that prioritize safety, efficiency, and stakeholder satisfaction.
PROJECT IMPACT
Key Outcomes
Conducted Traffic Signal Analysis across two IDOT detour route contracts
Compiled comprehensive traffic count data from multiple intersections
Prepared two detailed detour technical memos for CDOT approval
Assessed detour impacts across nine critical Chicago intersections
Ensured safety and efficiency of roadways during construction detours
Proactively addressed potential traffic flow challenges before implementation
Strengthened collaboration between IDOT, AGI, and CDOT
Delivered high-quality analysis prioritizing safety and stakeholder satisfaction
Project Information
Client
Illinois Department of Transportation
Location
Chicago, IL
Project Type
Traffic Signal Analysis for Detour Routes
Completion
Completed 2025