Accurate Group, Inc. is the Prime for this contract. The proposed improvements consisted of installation of a Frontage Road Storm Sewer (FRS) and 18” RCP Stubs at each side street along Harrison St. The proposed FRS along Harrison St. will be constructed from 21st Ave. to Sta. 245+00 (west of the Des Plaines River) where it will be connected to a 72” dia. FRS around Sta. 245+00 from the adjacent contract (80C98). Watermain and combined sewers will be jacked between Harrison St. and Bataan Dr. under I-290 between 21st Ave. and 1st Ave.

Scope of Work:

This project consisted of installing Frontage Road Sewers (FRS) along Harrison Street, as well as jacking watermains and combined sewers from Harrison St. to Bataan Dr. under I-290. The FRS will be constructed to alleviate flooding in this area along I-290 located in the Villages of Maywood and Broadview, within Cook County about 2.5 miles west of the City of Chicago. This contract is part of the I-290 corridor improvements, which include the widening of I-290 between I-294 and the Jane Byrne Interchange.

A Topographic Survey and Subsurface Utility Engineering (SUE) study was completed as part of this contract. Utility Coordination was a significant task due to all of the existing utilities located within the project limits and the conflicts with the installation of the FRS and relocations of the watermain and combined sewers.

The improvements consisted of installation of a Frontage Road Storm Sewer (FRS) and 18” RCP Stubs at each side street along Harrison St. from 21st Ave. to east of 1st Ave. It will eventually connect to a difference contract and outlet to the Des Plaines River. The FRS is a critical component of the Village of Maywood’s sewer separation project to alleviate flooding in the area.

The scope of roadway work included reconstruction of Harrison St. 21st Ave. to 9th Ave. and resurfacing and patching from 9th Ave. to 1st Ave. ADA Ramps were designed along Harrison St. and the HMA paved shoulders on the south side of Harrison St. and north side of Bataan Dr. were reconstructed.

The scope of utility work involves the removal and relocation of existing combined sewer and watermain utility lines that are under the Village of Maywood jurisdiction and will conflict with the proposed FRS construction. The relocations were designed to meet the minimum Illinois Environmental Protection Agency (IEPA) water and sewer separation requirements. Two conflict chambers were constructed for the combined sewers being jacked under I-290 and the installation of the FRS. The FRS and combined sewers have similar invert elevations and a conflict chamber was required at both locations.

Key Elements of the Project:

  • Frontage Road Sewer (FRS) Installation: The core of the project involves the installation of a Frontage Road Sewer system. This is a critical component of the Village of Maywood’s sewer separation project to alleviate flooding in the area. The FRS consists of 66” RCP installed in an open-trench until 1st Ave. The FRS is being jacked under 1st Ave. to reduce the impacts to the traveling public along 1st Ave.
  • Watermain & Combined Sewer Relocation: Existing Watermain and Combined Sewer in conflict with the FRS installation will be relocated along Harrison St. Watermain will be relocated to underneath the sidewalk and combined sewer will remain underneath the roadway. Watermain and Combined Sewer will be jacked under I-290 ahead of the widening and lowering of I-290 from 21st Ave. to 1st Ave.
  • Roadway Reconstruction & Resurfacing: Reconstruction of Harrison St. 21st Ave. to 9th Ave. and resurfacing and patching from 9th Ave. to 1st Ave.
  • ADA & Pedestrian Improvements: The sidewalk along the north side of Harrison St. was reconstructed from 21st Ave. to 5th Ave. and ADA Ramps were reconstructed from 21st Ave. to 1st Ave.

Challenges and Considerations:

  • Traffic Management During Construction: Maintaining access to driveways during construction will be a significant challenge when the FRS is in the middle and north side of Harrison St. Maintenance of Traffic (MOT) plans were prepared to provide access to driveways during construction. Certain stages of construction required Harrison St. to be detoured; however, access was still maintained to driveways. Ramps along Harrison St. were detoured while construction of the FRS was in front of the ramp and additional signing along I-290 was required to facilitate the traffic during ramp closures.
  • Coordination with Municipalities and Stakeholders: Coordination with the Village of Maywood and their residents through the duration of construction to ensure access to driveways, coordination with the Village of Maywood for the watermain services, and coordinating Detour Routes.

Benefits of the Project:

  • Reduce flooding: The FRS, once it is outlet to the Des Plaines River will reduce flooding in the area.
  • Utilities relocated in advance of the I-290 widening and lowering: This advanced contract will expedite the widening and lowering of I-290 corridor because the watermain and combined sewer utilities will be relocated out of the way ahead of time.

PROJECT IMPACT

Key Outcomes

Installed a new Frontage Road Sewer (FRS) supporting Maywood's sewer separation program

Designed trenchless FRS installation beneath 1st Avenue to minimize traffic impact

Relocated conflicting watermain and combined sewer facilities along Harrison Street

Jacked watermain and sewer crossings beneath I-290 ahead of future reconstruction

Reconstructed Harrison Street from 21st Avenue to 9th Avenue, with resurfacing beyond

Delivered ADA-compliant curb ramps and sidewalk reconstruction along the corridor

Developed Maintenance of Traffic plans preserving local access during construction

Reduced future utility conflicts, improving constructability for I-290's widening

Key Elements of the Project

Frontage Road Sewer (FRS) Installation

Centerpiece of the project; a critical component of Maywood's long-term sewer separation program intended to significantly reduce area flooding once connected to its ultimate outlet at the Des Plaines River.

Watermain & Combined Sewer Relocation

Conflicting facilities relocated along Harrison Street, with the watermain repositioned beneath the sidewalk and the combined sewer remaining within the roadway corridor. New I-290 crossings used trenchless installation methods, with two specialized conflict chambers designed to accommodate intersecting systems with similar invert elevations, satisfying IEPA water/sewer separation requirements.

Roadway Reconstruction & Resurfacing

Harrison Street reconstructed from 21st Avenue to 9th Avenue, with resurfacing and pavement patching from 9th Avenue to 1st Avenue, plus HMA paved shoulder reconstruction along Harrison Street and Bataan Drive.

ADA & Pedestrian Improvements

Sidewalk reconstruction along the north side of Harrison Street from 21st Avenue to 5th Avenue, and ADA-compliant curb ramps from 21st Avenue to 1st Avenue.

Project Information

Client

Illinois Department of Transportation

Location

Cook County, IL (Villages of Maywood and Broadview)

Project Type

Frontage Road Storm Sewer Installation & Utility Relocation

Completion

Design Completed 2026