IL 50 from County Line Rd. to Wilmington-Peotone Rd. Road Diet
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) played a crucial role in Phase I Engineering Services for a Road Diet project on IL 50, spanning from County Line Rd. to Wilmington-Peotone Rd. This project, funded through the Highway Safety Improvement Program (HSIP), aimed to enhance roadway safety and efficiency through a comprehensive engineering design study that adhered to the Illinois Department of Transportation’s (IDOT) Bureau of Design and Environment’s policies and procedures.
The primary objective of the Phase I Engineering Services was to conduct preliminary engineering and environmental studies, culminating in obtaining approvals from the Illinois Department of Transportation (IDOT), the Federal Highway Administration, and other pertinent regulatory agencies.
Some of the key services provided by AGI included the preparation of a detailed project report outlining the project scope, objectives, and proposed improvements. Additionally, the team developed a comprehensive Transportation Management Plan to ensure the efficient management of traffic during the implementation of the Road Diet. Environmental Service Requests (ESRs) were submitted to address potential environmental considerations and compliance requirements, demonstrating a commitment to sustainable and environmentally conscious practices.
AGI conducted a thorough Crash and Safety Analysis to identify potential safety concerns and propose mitigation measures to enhance the overall safety of the roadway. Intersection Design Studies (IDS) were performed to optimize intersection functionality and improve traffic flow. Additionally, a bicycle travel assessment was conducted to enhance the accommodation of cyclists along the roadway.
Moreover, AGI prepared wetland exhibits to address any potential impacts on wetland areas and ensure compliance with environmental regulations. Geometric Studies were undertaken to optimize the roadway design, considering factors such as lane configuration, turning radii, and alignment to enhance the overall efficiency and safety of the roadway.
PROJECT IMPACT
Key Outcomes
HSIP-funded Phase I study for an IL 50 Road Diet (P-91-023-21)
Project Report and Transportation Management Plan
Environmental Survey Requests and wetland exhibits
Crash and safety analysis with mitigation measures
Intersection Design Studies and geometric studies
Bicycle travel assessment to better serve cyclists
Project Information
Client
Illinois Department of Transportation
Location
Will County, IL
Project Type
Phase I Engineering & Road Diet Study
Completion
Completed 2026