Tollway Grand Ave. Ramp Reconstruction and Systemwide Various Repairs I-94 (MP 4.5 to 27.0) and I-294 (MP 40.2 to 48.0)
PROJECT OVERVIEW
About This Project
This project primarily focused on the reconstruction of the existing ramps at the Grand Avenue/I-294 Interchange. This interchange serves some of the largest stakeholders in Lake County including the Six Flags Great America, Gurnee Mills Outlet Mall, Key Lime Cove and the Village of Gurnee. AGI assisted the Tollway in conducting quarterly stakeholder meetings and worked closely with the Village of Gurnee throughout the duration of the project to keep all the stakeholders well informed. While executing the construction, the GC and AGI were faced with a few major challenges including complete plan revisions due to alignment issues, unforeseen utility conflicts and tight milestone completion dates. AGI had to revise the MOT staging plans in multiple areas in order to provide the contractor adequate work space while keeping the motorists safety the top priority. Despite all the challenges, the construction was able to meet the key interim completion dates essential to the stakeholders. Upon completion Accurate Group received a letter from the Village recognizing our excellent coordination efforts. The systemwide improvements included electrical upgrades and lane reconstruction at various Ramp Toll Plazas, including Plazas 31 and 32 which serve O’Hare. AGI worked closely with Business Systems and ETC to provide detailed electrical drawings to relocate the lane controllers from outside into the plaza buildings. In addition, the staging plans had to be completely revised to address traffic volumes, delays and lane controller issues that were not accounted for in the contract drawings. AGI provided around the clock traffic surveillance at various times during the reconstruction to minimize impacts to traffic. The Contractor was named the “Contractor of the Year” by the Illinois Road Builders Association.
Project Information
Client
Illinois State Toll Highway Authority
Location
Gurnee, IL
Project Type
Construction Management & Inspection
Completion
Completed 2017