PROJECT OVERVIEW
About This Project
Project consisted of the rehabilitation of six bridge structures (I-294 over CSX Railroad, I-294 over Thorn Creek, I-294 over Flag Creek by Joliet Road, I-294 over Flag Creek by 47th Street, I-294 by Maple Street, and I-294 over Thornton Quarry). These repairs included deck and approach slabs patching, replacement of joint seals, power washing superstructure, deck sealing, repair of substructure elements with formed concrete repair and epoxy crack injection, restorative work on concrete slopewalls, drainage system repairs and partial deck overlay. The project also included the Tollways first installation of precast reinforced concrete panel replacements for approach and transitions slabs at SB I-294 over Midlothian Turnpike. In order to perform the deck repairs on the I-80 section, AGI made necessary modifications to the MOT plans to account for special weekend extended closures and provided 24-hour traffic control surveillance/reporting to the Tollway. AGI also created special joint details for CSX bridge due to varying field conditions.
Project Information
Client
Illinois Tollway
Location
Illinois Tollway
Project Type
Construction Management & Inspection
Completion
Completed 2016