ISTHA – Tri-State Roadside Safety and Structural Repairs I-294 (MP 23.0 to 52.8)
PROJECT OVERVIEW
About This Project
Project consisted of reconstruction of the NB I-294 to Lake Cook Ramp, bridge joint and deck repairs of the I-294 bridge over I-55 and I-294 over North Ave./Lake Street, Deerfield Salt Dome Pavement Rehabilitation, breakaway light pole replacement at the Bensenville and I-294 over I-55 bridges, approach slab and parapet wall repairs at the I-294 bridge from I-55 to NB I-294, retaining wall repairs, guardrail improvements, and other safety improvements along I-294 mainline and ramps between MP 39.8 and 52.8. AGI took a proactive approach and thoroughly reviewed the current field conditions with the work shown in the plans. This resulted in construction revisions being issued in most cases prior to the work being started by the contractor. AGI coordinated with the Contractor to keep the job progressing despite the design revisions. AGI worked closely with the materials department to implement and monitor the performance of the Tollways first use of Calcium Aluminate fast set concrete mix for bridge deck and approach slab repairs. While performing the work at the I-294 bridge from I-55 to NB I-294, AGI observed significant issue with the bridge abutment which resulted in the partial reconstruction of the abutment, approach slab, and implemented drainage improvements to eliminate further deterioration of the abutment and approach slabs.
Project Information
Client
Illinois Tollway
Location
Illinois Tollway
Project Type
Construction Management & Inspection
Completion
Completed in 2019