PROJECT OVERVIEW

About This Project

PTB 178-002: US 41 at IL 176 Storm Water Pump Station No. 37
Contract No. 62B66

Accurate Group, Inc. (AGI), serving as a subconsultant to Donohue & Associates, delivered the survey, civil design, specifications, quantities, and construction cost estimate for the new Storm Water Pump Station No. 37.

AGI’s scope included:

  • Supplemental survey to support final design
  • Permitting and coordination with SWPPP, U.S. Army Corps of Engineers (ACOE), Illinois Department of Natural Resources (IDNR), Lake County, Union Pacific Railroad, and the PESA Response and ESR Addendum
  • Outlet drainage pipe design for the new pump station

Construction was staged to accommodate the frontage road closure and outlet pipe installation. To minimize disruption, portions of the outlet pipe were installed by jacking beneath the IL 176 bike path, preserving this important community corridor. The pipe was also jacked beneath the Union Pacific Railroad tracks, avoiding impacts to rail operations.

Project Information

Client

Illinois Department of Transportation (Sub to Donohue & Associates)

Location

Lake Forest, IL

Project Type

Storm Water Pump Station & Outlet Drainage Design

Completion

Design Completed 2024