DMS Sign Structures for I-80 to I-55
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) played a pivotal role in the comprehensive planning and execution of a project involving the installation of Dynamic Message Signs (DMS), Closed-Circuit Television (CCTV) cameras, and a Fiber Optic network on expressways at multiple strategic locations. The project required meticulous attention to detail and expertise in various engineering disciplines to ensure its successful implementation.
AGI’s responsibilities included the preparation of detailed contract plans, specifications, and construction cost estimates for the DMS sign installations. This encompassed the integration of CCTV cameras and the Fiber Optic network at key locations, enhancing the overall efficiency and safety of the expressways. The AGI’s team provided geotechnical engineering expertise, conducted structural design for the signs, performed Barrier warrant analysis at each location, and meticulously prepared overall plan documentation.
Moreover, AGI collaborated closely with the Bureau of Traffic’s consultant to incorporate the electrical plans into the comprehensive contract plans. This collaborative effort ensured seamless integration and coordination of all aspects of the project, guaranteeing a cohesive and efficient implementation process.
The project involved the installation of DMS signs at various critical locations, including key expressway locations such as I-55 at W. Summit Rd., I-55 at Harris Dr., I-80 at Shepley Rd., I-80 at Cherry Hill, I-80 West and East of Larkin, and I-290 at Mill Rd. Each location presented unique challenges and requirements, which AGI’s team navigated with precision and expertise.
Through meticulous planning, diligent execution, and effective collaboration with stakeholders, AGI successfully delivered a project that will significantly enhance traffic management and communication on these expressways. The installation of DMS signs, CCTV cameras, and Fiber Optic network infrastructure represents a vital investment in transportation infrastructure that will improve safety, efficiency, and overall traffic flow for commuters and the community at large.
PROJECT IMPACT
Key Outcomes
Delivered structural design for DMS signs at six key expressway locations
Provided geotechnical engineering expertise supporting sign foundation design
Performed Barrier warrant analysis at each installation location
Integrated CCTV cameras and Fiber Optic network infrastructure
Collaborated with the Bureau of Traffic's consultant on electrical plan integration
Prepared comprehensive contract plans, specifications, and cost estimates
Enhanced traffic management and communication across two major counties
Strengthened safety, efficiency, and traffic flow for regional commuters
Project Information
Client
Illinois Department of Transportation
Location
Will and DuPage Counties, IL
Project Type
Dynamic Message Sign, CCTV & Fiber Optic Infrastructure
Completion
Design Completed 2019