Accurate Group, Inc. (AGI) played a pivotal role in the Phase I/II Engineering for the development of a new 10′-wide trail connecting Altgeld Gardens to a proposed gathering space near the boat launch in Beaubien Woods. This project aimed to enhance connectivity, accessibility, and recreational opportunities for the local community while promoting sustainable transportation options and environmental conservation.

As part of the engineering process, AGI conducted a thorough analysis to develop 2-3 alternative path alignments for the trail, considering the pros and cons of each option and providing cost estimates to support decision-making. These alternative alignments were carefully evaluated to ensure that the chosen path would maximize usability, minimize environmental impact, and align with the project’s goals of promoting connectivity and accessibility.

In addition to the trail alignment, AGI designed a culvert to facilitate the crossing of a drainage ditch, ensuring proper water flow and minimizing environmental disruption. The design of this culvert was essential to the functionality and sustainability of the trail, highlighting AGI’s commitment to integrating environmentally conscious solutions into the project.

Furthermore, AGI undertook the repair of a separated sewer outlet near the proposed trailhead, addressing critical infrastructure needs and ensuring the proper function and environmental integrity of the surrounding area. Additionally, measures were taken to address erosion along the shoreline, with AGI pulling back the headwall to stabilize and protect the area. The surveyors from AGI meticulously surveyed the existing headwall and shoreline to inform the design and construction process accurately.

To enhance the usability and safety of the trail, AGI implemented measures to prevent vehicle access and prohibit dumping along the trail beginning at Altgeld Gardens. These proactive measures aimed to preserve the integrity of the trail, promote a welcoming and safe environment for trail users, and mitigate potential environmental hazards.

PROJECT IMPACT

Key Outcomes

New 10-foot-wide trail from Altgeld Gardens to Beaubien Woods

Two to three alternative alignments with cost estimates

Culvert design for the drainage ditch crossing

Repair of a separated sewer outlet near the trailhead

Shoreline erosion control and headwall survey

Measures to prevent vehicle access and illegal dumping