Harts Road over N. Branch Chicago River

Harts Road
Harts Road
Harts Road over North Branch Chicago River

PROJECT OVERVIEW

About This Project

Accurate Group, Inc (AGI) took on a comprehensive role in the project, meticulously planning every aspect from design to construction. The team crafted detailed design plans, specifications, and quantities, while also providing an accurate construction cost estimate for the removal and replacement of the superstructure, along with necessary substructure repairs.

The project involved replacing the existing PPC deck beams with precision, ensuring they were replaced in-kind and then overlaid with a durable 5-inch non-composite concrete wearing surface. The repair of the abutments was carried out with careful attention to detail, utilizing formed concrete repair and epoxy crack injection as necessary, all while incorporating Fiber Wrap for added reinforcement.

Additionally, AGI included the removal and replacement of the approach spans and sidewalks, while also implementing safety enhancements by replacing the existing guardrail. The scope of work extended to include stream bank stabilization, drainage improvements, NW Wingwall Replacement, and managing the environmental permits, including the critical 404 Permit Application.

Despite the complexities involved, AGI successfully executed the project, ensuring all work was carried out with minimal disruption by utilizing a detour route. This meticulous approach, coupled with the team’s expertise and attention to detail, resulted in the successful completion of the project, ultimately delivering a new and improved bridge structure that will benefit the community for years to come.

PROJECT IMPACT

Key Outcomes

Replaced the bridge superstructure with in-kind PPC deck beams

Applied a durable 5-inch non-composite concrete wearing surface

Repaired abutments using formed concrete repair and Fiber Wrap reinforcement

Replaced approach spans, sidewalks, and guardrails enhancing safety

Delivered stream bank stabilization and drainage improvements

Secured environmental compliance through the 404 Permit Application

Minimized disruption to traffic through a well-planned detour route

Delivered a new, improved bridge structure benefiting the community for years

Project Information

Client

Illinois Department of Transportation

Location

Niles, IL

Project Type

Bridge Superstructure Replacement & Substructure Repair

Completion

Design Completed 2015