PROJECT OVERVIEW

About This Project

Accurate Group, Inc. (AGI) is serving as a subconsultant to multiple engineering firms on various sections of the expansive I-80 reconstruction project. This ambitious project spans approximately 16 miles of I- 80, covering a corridor from Ridge Road to U.S. 30. The reconstruction impacts a major transportation route that crosses three counties—Kendall, Grundy, and Will—and passes through six municipalities, including Minooka, Channahon, Shorewood, Rockdale, Joliet, and New Lenox. The project also involves the reconstruction of critical infrastructure spanning four major waterways: DuPage River, Rock Run Creek, Des Plaines River, and Hickory Creek. Additionally, the corridor includes eight key interchanges, making this one of the region’s most significant transportation improvement efforts.

AGI’s Role as a Subconsultant:

AGI worked as a subconsultant to TranSystems for a significant portion of the I-80 reconstruction, specifically focused on the stretch from Houbolt Road to west of Center Street, as well as the Larkin Avenue Interchange. This section of I-80 is a critical part of the overall corridor, serving as a major connector for both regional and interstate traffic, particularly heavy commercial vehicles. The project is designed to improve traffic flow, safety, and the structural integrity of key roadway and bridge components.

Scope of Work:

The primary scope of work for AGI on this segment of the I-80 reconstruction included the preparation of contract plans, technical specifications, and cost estimates for the proposed roadway and bridge improvements. The project will consist of a full reconstruction of I-80 between Houbolt Road and Center Street, with significant enhancements to improve traffic capacity, safety, and resilience.

AGI worked as a subconsultant to WSP for a significant portion of the I-80 reconstruction, specifically focused on the stretch from west of Center Street to east of Chicago Street, including the Center Street, Chicago Street Interchanges, and the Des Plaines River Bridge. This section of I-80 is a critical part of the overall corridor, serving as a major connector for both regional and interstate traffic, particularly heavy commercial vehicles. The project is designed to improve traffic flow, safety, and the structural integrity of key roadway and bridge components.

The primary scope of work for AGI on this segment of the I-80 reconstruction included the preparation of contract plans, technical specifications, and cost estimates for the proposed roadway and bridge improvements. The project will consist of a full reconstruction of I-80 between Center Street and Chicago Street, with significant enhancements to improve traffic capacity, safety, and resilience.

Key Elements of the Project:

  • Reconstruction of I-80: The core of the project involves the complete reconstruction of this heavily trafficked stretch of I-80, which is critical for regional and interstate freight movement. This section has experienced significant wear over the years, requiring modernization to meet current traffic demands and safety standards. The reconstructed roadway will feature upgraded pavement designed to handle the increased load of trucks and passenger vehicles that use this corridor daily.
  • Auxiliary Lane Addition: An auxiliary lane will be added in both directions between Larkin Avenue Chicago Street to facilitate smoother traffic flow and reduce congestion, particularly at interchanges. This lane will provide additional capacity for merging and diverging traffic, reducing bottlenecks and enhancing overall safety for drivers.
  • Larkin Avenue Interchange Enhancements: The Larkin Avenue Interchange will undergo a significant upgrade, including the addition of new ramps and reconfiguration to improve traffic flow and safety. These improvements are designed to ease congestion at one of the busiest interchanges in the region, providing smoother transitions for vehicles entering and exiting I-80. The reconfiguration will also improve access to local streets and reduce conflict points between vehicles.
  • Des Plaines River Bridge: The project includes the construction of the Des Plaines River Bridge, a crucial structure that will span the Des Plaines River. This bridge is a vital component of the I-80 corridor, and its construction will include state-of-the-art design and materials to ensure long-term durability and safety. The new bridge will replace aging infrastructure and improve the capacity and resilience of the crossing. The new structure will be constructed on a different alignment.
  • Chicago Street Interchange Enhancements: The Chicago Street Interchange will undergo a significant upgrade, including the reconstruction of ramps to improve traffic flow and safety. These improvements are designed to ease congestion at one of the busiest interchanges in the region, providing smoother transitions for vehicles entering and exiting I-80. The reconfiguration will also improve access to local streets and reduce conflict points between vehicles.
  • Center Street Interchange Enhancements: The Center Street Interchange will undergo a significant upgrade, including reconstruction of ramps to improve traffic flow and safety. These improvements are designed to ease congestion at one of the busiest interchanges in the region, providing smoother transitions for vehicles entering and exiting I-80. The reconfiguration will also improve access to local streets and reduce conflict points between vehicles.

Challenges and Considerations:

  • Traffic Management During Construction: Maintaining traffic flow along I-80 during construction is a primary challenge, given the high volume of daily commuter and freight traffic. Construction will be staged to minimize disruptions, with comprehensive traffic management plans in place to ensure the safety and convenience of both motorists and construction crews. Temporary lane shifts, detours, and night work will be considered to mitigate delays and congestion.
  • Environmental and Permitting Considerations: As the project crosses several key waterways, environmental considerations are paramount. Compliance with regulatory requirements, including environmental impact assessments and water management permits, will be critical to avoid disruptions to local ecosystems. AGI will assist in ensuring that all construction activities align with the necessary environmental guidelines and obtain the required permits for water crossings and other sensitive areas.
  • Coordination with Municipalities and Stakeholders: The project spans six municipalities, requiring close coordination with local governments, utility companies, and other stakeholders to ensure smooth project execution. AGI assisted TranSystems and WSP in maintaining open lines of communication with all relevant parties, ensuring that construction progresses on schedule and within the set budget.

Benefits of the Project:

  • Improved Traffic Capacity and Flow: The addition of an auxiliary lane and upgraded interchanges will significantly improve traffic flow along I-80, reducing congestion and improving safety for both local and long-distance travelers.
  • Enhanced Structural Integrity: The reconstruction of bridges and roadways, particularly the Des Plaines River Bridge, will ensure the structural integrity of the interstate for decades to come. This is especially important given the heavy commercial traffic that relies on I-80 as a primary freight corridor.
  • Safety Improvements: The addition of modern safety features, including improved ramps, better signage, and upgraded lane configurations, will help reduce accidents and improve the overall safety of the I-80 corridor.

PROJECT IMPACT

Key Outcomes

Supported reconstruction across a 16-mile stretch of I-80 spanning three counties

Contributed to the design of the new Des Plaines River Bridge

Supported enhancements to the Larkin Avenue, Center Street, and Chicago Street Interchanges

Added auxiliary lanes improving traffic flow and reducing congestion

Prepared detailed contract plans and cost estimates for roadway and bridge work

Coordinated across multiple municipalities, utilities, and regional stakeholders

Supported environmental compliance across four major waterway crossings

Strengthened the structural integrity and resilience of a critical freight corridor

Project Information

Client

Illinois Department of Transportation (Sub to WSP USA, Inc. and TranSystems Corporation)

Location

Will County, IL

Project Type

Interstate Reconstruction – Roadway & Bridge Improvements

Completion

Design Completed 2025