IL 176 from Deerpass Rd. to Dean St.
PROJECT OVERVIEW
About This Project
Accurate Group, Inc. (AGI) was the Prime Consultant on this project, which focused on designing and implementing critical safety improvements along the IL Route 176 corridor, extending from Deerpass Road to Dean Street. The goal was to enhance roadway safety, improve traffic flow, and address infrastructure deficiencies, particularly at key intersections and along the roadway shoulders. The work involved preparing detailed contract plans, specifications, and comprehensive time and cost estimates to ensure the project’s success.
The safety improvements included the addition of left-turn lanes at eight key intersections within the project limits, shoulder widening, guardrail upgrades, and significant culvert repairs or replacements. These enhancements were designed to address high-traffic volumes and reduce the risk of collisions, particularly at intersections. Additionally, centerline and shoulder rumble strips were proposed to provide drivers with tactile and audible warnings, reducing the likelihood of lane departure accidents.
Key Improvements:
- Left-Turn Lane Additions: Left-turn lanes were designed and added at eight intersections along IL Route 176, improving traffic flow and safety by reducing rear-end collisions and conflicts between turning and through vehicles. These lanes provide a safer, dedicated space for vehicles making left-hand turns, minimizing disruptions to the main traffic stream.
- Shoulder Widening: The existing shoulders were widened to 8 feet in both directions, allowing for safer emergency pull-offs and providing additional recovery space for vehicles straying from the travel lanes. This improvement significantly enhances safety, particularly for larger vehicles and during inclement weather.
- Guardrail Replacement: Outdated or damaged guardrails were replaced to meet current safety standards, providing enhanced protection for vehicles in the event of run-off-road incidents.
- Culvert Repairs, Replacement, and Widening: The project involved the repair and/or replacement of 12 culverts along the corridor, many of which required widening to accommodate the new lane configurations and wider intersections. Several culverts were in poor condition and needed replacement to ensure proper drainage and roadway stability. These improvements were vital to prevent roadway flooding and erosion while supporting the widened shoulders and intersections.
- Rumble Strips: Centerline and shoulder rumble strips were proposed along the entire corridor to enhance driver awareness, especially during night driving or adverse weather conditions. These strips are designed to alert drivers when they are veering off the road or crossing into oncoming traffic, thereby reducing the risk of accidents.
- Environmental and Permitting Requirements: The project required several environmental and regulatory clearances to proceed, including:
- PESA (Preliminary Environmental Site Assessment) Response: An evaluation to assess the potential presence of hazardous materials or environmental concerns along the project corridor.
- PSI (Preliminary Site Investigation) Update: A follow-up to the PESA to investigate any identified environmental risks and ensure they were addressed before construction began.
- Wetland Impact Evaluation (WIE): An assessment of potential impacts on nearby wetlands, ensuring compliance with environmental regulations and minimizing ecological disruption.
- US Army Corps of Engineers (USACOE) Section 404 Permit: Required for any work impacting wetlands or waters of the U.S., particularly for culvert replacements and modifications that could affect drainage and water flow.
- Stormwater Pollution Prevention Plan (SWPPP) Permit: Required for disturbing over 1 acre of soil within project limits. Each storm water plan must include a site map and a description of the measures and controls that will be used to prevent and/or minimize pollution of storm water.
- Traffic Maintenance and Construction Staging: To minimize disruptions along this heavily traveled corridor, traffic was maintained throughout the construction process utilizing staged construction and temporary traffic control measures. This approach allowed for a phased implementation of the improvements, ensuring that traffic flow was maintained while key safety upgrades were made. Temporary pavement was added at a few locations to ensure one lane of traffic each way was maintained during construction.
Services Provided:
- Culvert Repairs and Replacements: Assessment and repair/replacement of 12 culverts, improving drainage and structural integrity.
- Culvert Widening: Lengthening of culverts to accommodate the widened shoulders and intersections.
- Left-Turn Lane Design and Addition: Installation of left-turn lanes at eight intersections to improve traffic flow and safety.
- Shoulder Widening: Expansion of roadway shoulders to 8 feet for improved safety and vehicle recovery.
- Maintenance of Traffic: Staging and traffic control plans to maintain vehicular flow during construction.
- PESA and PSI Updates: Environmental assessments to ensure compliance with safety and regulatory standards.
- WIE and 404 Permit Application: Environmental evaluations and permits to protect wetlands and waterways impacted by construction.
- SWPPP: Developed a plan, tailored to the specific conditions and with the primary goal of controlling pollutants that may be discharged into storm water runoff.
- Supplemental Survey: Detailed field surveys to assess existing conditions and ensure accurate design and construction.
PROJECT IMPACT
Key Outcomes
Added left-turn lanes at eight intersections, reducing collisions and conflicts
Widened shoulders to eight feet, improving emergency pull-off safety
Repaired or replaced 12 culverts, enhancing drainage and structural stability
Installed centerline and shoulder rumble strips to reduce lane departure accidents
Replaced outdated guardrails to meet current safety standards
Secured environmental and wetland clearances including a USACOE 404 Permit
Maintained continuous traffic flow through staged construction and temporary pavement
Delivered comprehensive safety upgrades as Prime Consultant on the corridor
Project Information
Client
Illinois Department of Transportation
Location
Marengo, IL
Project Type
Roadway Safety Improvements
Completion
Design Completed 2021