PROJECT OVERVIEW

About This Project

The Mile Long Bridge is a critical piece of infrastructure on the Central Tri-State Tollway (I-294) corridor as it carries drivers over two major railroads, three water resources and local roads, and over a major distribution center for UPS and Burlington Northern Santa Fe (BNSF) Railway.

The $500-million-Mile-Long Bridge Project began in summer 2019 and was complete in 2023. Work included construction of two new, wider bridge structures, as well as stormwater, drainage and related infrastructure improvements. Construction on the new northbound bridge was completed in 2020 and work on the new southbound bridge was complete in 2022.

The Tollway is committed to maintaining four lanes of traffic in each direction throughout construction. Currently, up to 150,000 vehicles travel on the Mile Long Bridge daily.

Accurate Group, Inc. (AGI) is a subconsultant to Bowman Consulting for this contract. AGI is tasked with construction inspection and surveying services for this contract. The overall tasks for this project include Phase III engineering services for the construction inspection, and supervision on the Tri-State Tollway for all construction contracts associated with the Mile Long Bridge in Cook County, Illinois

Project Information

Client

Illinois Tollway (Sub to Bowman Consulting)

Location

Illinois Tollway

Project Type

Construction Management & Inspection

Completion

Completed 2023