ISTHA – Pavement and Bridge Repairs and Preservation I-294 (MP 0.0 to 8.25)

ISTHA – Pavement and Bridge Repairs and Preservation I-294 (MP 0.0 to 8.25)

PROJECT OVERVIEW

About This Project

The work under this contract included superstructure and substructure repairs to seven bridges, pavement patching of hinge-jointed and reinforced concrete pavements with precast concrete panels, accelerated and fast set patching to bridge decks, approach slabs, transition slabs and reinforced concrete pavements, repairs to three retaining walls, installation if a Virtual Weigh-In-Motion system (VWIM), drainage improvements, guardrail upgrades and LED retrofits. After letting, the Tollway eliminated almost all permanent staging and revised the work to be competed at night during nightly lane closures. During construction AGI provided detailed staging plans and 24-hour traffic surveillance to perform unforeseen fast set and accelerated pavement repairs along the I-80/I-294 corridor. AGI was proactive in addressing varying field conditions with drainage, lighting and guardrails as compared to contract plans to assure by providing additional details and revised plans to assure a quality end product for the Tollway and its users. AGI coordinated with the Plaza Supervisor in order to complete patching repairs and other associated work at Toll Plazas 41, 43 & 45. AGI collaborated with the GC, electrical subcontractor, VWIM subcontractor, materials and Tollway ITS Department to develop and install the first continually reinforced concrete precast virtual weigh-in-motion system which will be the new standard for the Tollway for future projects.

Project Information

Client

Illinois Tollway

Location

Illinois Tollway

Project Type

Construction Management & Inspection

Completion

Completed 2019

Services Provided