ISTHA – Pavement and Bridge Repairs and Preservations I-294 (MP 8.25 to 17.60)
PROJECT OVERVIEW
About This Project
The work under this contract included superstructure and substructure repairs to thirty-three bridge structures. Bridge repairs consisted of epoxy crack injection, formed concrete repair, beam repair, concrete sealing and bearing seat repairs on the substructures. Super structure repairs included replacing seals, deck, approach and transition slab patching, parapet wall repairs, and deck sealing. Other work included drainage repairs, lighting controller upgrades and new LED lighting, guardrail upgrades, barrier wall installations and extension, shoulder repairs and microsurfacing. After letting, the Tollway eliminated almost all permanent staging and revised the work to be competed at night during nightly lane closures. AGI worked closely with the contractor to schedule and execute the work while minimizing impacts to the motoring public. AGI again took a proactive approach in reviewing and addressing varying field conditions with drainage, lighting and guardrails as compared to contract plans by providing additional details and revised plans to assure a quality end product for the Tollway and its users.
Project Information
Client
Illinois Tollway
Location
Illinois Tollway
Project Type
Construction Management & Inspection
Completion
Completed in 2018