O'Hare Modernization Program (OMP) – Runway 9L-27R Extension and Associated Taxiway
PROJECT OVERVIEW
About This Project
As part of the O’Hare Modernization Program, Accurate Group played a critical role in the preparation of plans for the Chicago O’Hare International Airport Runway 9L-27R Paving, Lighting, and Signing project. This project aimed to reconfigure the runway to reduce delays and increase airfield capacity, ultimately enhancing the efficiency and functionality of the airport.
Runway 9L-27R, with dimensions of 7,500 feet in length and 150 feet in width, was specifically designed to accommodate Group V aircraft, with wingspans up to 214 feet and tail heights up to 66 feet. This design ensured that the runway could effectively cater to larger aircraft, contributing to improved operational capabilities and increased airfield capacity.
The project entailed the construction of a full-length parallel taxiway and associated high-speed end and crossover taxiways, enhancing the connectivity and accessibility of the runway and taxiway systems. Key elements of the scope of work included clearing, grubbing, earthwork, paving, and the integration of new pavements with existing runway and taxiway infrastructure, ensuring seamless transitions and operational efficiency.
Additionally, the project encompassed the installation of runway and taxiway underdrains, local drainage systems, and electrical work to support the functionality and reliability of the runway and taxiway network. Finishing elements such as pavement grooving, surface applications, pavement marking, topsoil, seed/sod placement, and erosion control measures were also incorporated to ensure the safety, durability, and sustainability of the newly constructed infrastructure.
Accurate Group’s contribution to the Chicago O’Hare International Airport Runway 9L-27R project was instrumental in driving the successful reconfiguration and enhancement of the runway system. Their expertise and attention to detail in planning and execution played a vital role in improving airfield capacity, reducing delays, and ultimately optimizing the operational efficiency of the airport within the framework of the O’Hare Modernization Program.
PROJECT IMPACT
Key Outcomes
Reconfigured the runway to reduce delays and increase airfield capacity
Designed a 7,500-foot runway to accommodate Group V aircraft
Constructed a full-length parallel taxiway with high-speed and crossover taxiways
Integrated new pavements seamlessly with existing runway infrastructure
Installed underdrains and drainage systems supporting long-term reliability
Enhanced electrical systems supporting runway and taxiway functionality
Improved safety and durability through pavement marking and erosion control
Delivered a modernized runway system enhancing O'Hare's operational efficiency
Project Information
Client
Chicago Department of Aviation
Location
Chicago O'Hare Airport, IL
Project Type
Airfield Runway & Taxiway Reconstruction