Runway 13C-31C Rehabilitation

Runway 13C 31C

PROJECT OVERVIEW

About This Project

Accurate Group played a pivotal role in the construction management of the Midway Airport Runway 13C-31C project, rehabilitating the longest and most active runway at Midway International Airport (MDW). With a length of 6,521 feet and Engineered Materials Arrestor Systems (EMAS) at both ends, the runway required rehabilitation due to surface deterioration.

Beyond the pavement overlay design, Accurate Group handled runway-related tasks including pavement markings, LED centerline and edge lighting, and airfield signage — enhancing the functionality and safety of one of the busiest runway intersections globally.

The project featured the world’s first installation of an EMAS with Glasopor in an active airport environment, providing enhanced overrun protection while reducing maintenance costs. To minimize disruption, all construction work was strategically scheduled at night during limited closures, requiring meticulous phasing and coordination.

PROJECT IMPACT

Key Outcomes

Rehabilitated Midway's longest and most active runway (6,521 feet)

Delivered a pavement overlay design addressing surface deterioration

Installed LED centerline and edge lighting improving nighttime safety

Upgraded airfield signage enhancing runway functionality and safety

Achieved the world's first EMAS installation with Glasopor in an active airport

Reduced maintenance costs and operational delays through innovative overrun protection

Minimized disruption via strategically scheduled nighttime construction phasing

Enhanced safety and efficiency at one of the busiest runway intersections globally

Project Information

Client

Chicago Department of Aviation

Location

Chicago Midway International Airport, IL

Project Type

Runway Rehabilitation & Construction Management