Runway 13C-31C Rehabilitation
PROJECT OVERVIEW
About This Project
Accurate Group played a pivotal role in the construction management of the Midway Airport Runway 13C-31C project, rehabilitating the longest and most active runway at Midway International Airport (MDW). With a length of 6,521 feet and Engineered Materials Arrestor Systems (EMAS) at both ends, the runway required rehabilitation due to surface deterioration.
Beyond the pavement overlay design, Accurate Group handled runway-related tasks including pavement markings, LED centerline and edge lighting, and airfield signage — enhancing the functionality and safety of one of the busiest runway intersections globally.
The project featured the world’s first installation of an EMAS with Glasopor in an active airport environment, providing enhanced overrun protection while reducing maintenance costs. To minimize disruption, all construction work was strategically scheduled at night during limited closures, requiring meticulous phasing and coordination.
PROJECT IMPACT
Key Outcomes
Rehabilitated Midway's longest and most active runway (6,521 feet)
Delivered a pavement overlay design addressing surface deterioration
Installed LED centerline and edge lighting improving nighttime safety
Upgraded airfield signage enhancing runway functionality and safety
Achieved the world's first EMAS installation with Glasopor in an active airport
Reduced maintenance costs and operational delays through innovative overrun protection
Minimized disruption via strategically scheduled nighttime construction phasing
Enhanced safety and efficiency at one of the busiest runway intersections globally
Project Information
Client
Chicago Department of Aviation
Location
Chicago Midway International Airport, IL
Project Type
Runway Rehabilitation & Construction Management