Accurate Group was selected as a prime consultant and will perform all the required work for a topographic survey and ADA ramp layout. Our services will include the preparation of CADD documents related to intersections, roads, ADA ramps and a topographical survey. The Chicago Department of Water Management will be replacing over 890 miles of water main.