Client: Illinois State Toll Highway Authority
Location: I-294 Kedzie Avenue to Cal Sag
AGI as a surveying sub consultant to KNIGHT E/A performed all the required work during reconstruction of I-294 from Kedzie Avenue to Cal Sag in City of Chicago. Work includes:
- Establishing horizontal and vertical control throughout the project NB and SB.
- 100 ft. cross section of main line and frontage roads existing conditioned and as build.
- Q/A survey work, verified all contractor’s staking, includes storm sewer, under cut, pavement stakes, bridge layout.