Client: Illinois Department of Transportation
Location: Pingree Grove, IL

Responsible for the design plans, specifications, cost estimate and quantities for the replacement of a double cell box culvert with a double cell cast-in-place box culvert on a 54 deg. skew. The length of improvement along IL 47 is approximately 1 mile. Additional work will include resurfacing, earthwork widening the shoulders and utility coordination. Permits include Section 404 Permit, IDNR/OWN Floodway Permits and SWPPP. Traffic will be maintained utilizing staged construction with a temporary traffic signal. This project is federally funded.