Performed all survey work required for the improvements of Milwaukee Avenue from Grand Street to Montrose Avenue. Work includes but not limited to:
Full topographic survey of existing
Work include
Establishing horizontal and vertical control
Full topographic survey
50 ft. cross section of Main Street and all side streets
Full utilities details
Tree counts
Sign inventory
Traffic counts
Vaulted sidewalk inventory
Prepare base drawings