Responsible for the design plans, specifications, cost estimate and quantities for the replacement of two culverts approximately 600 feet apart with 1 PPC I Beam single span superstructure supported on integral abutments. The length of improvement along IL 72 is approximately 1100 ft. Additional work will include resurfacing, earthwork widening the shoulders and utility coordination. Permits include Section 404 and 402 Permits, IDNR/OWN Floodway Permits and Section 401 Certification. Traffic will be maintained utilizing staged construction with a temporary traffic signal. This project is federally funded.